Indeed it is...launched the boat today after finishing up the installation of the new raw water intake system. The hoses, valves and elbows are all installed and clamped. All that is left is to bond the whole system. That will have to wait...we are launching today!
After the hoses were installed I reinstalled the battery shelves and boxes, all that remains with the electrical system upgrade is to install the new batteries. They are in, just waiting to be picked up from Sun Harbor.
On the shakedown run she ran a little hot. After inspection there was a ton of grass in the heat exchanger and hoses from last season. Now with the sea strainer in place that will all be eliminated. After cleaning the leftovers out she ran great, only getting up to about 165 degrees and the risers ran at a cool 75!
Can't wait to get back on the water on a regular basis and start catching again. I was so elated with being back in the water that I forgot to take pictures of the completed system, I will take some next week and post them with hopefully pics from my first striper of the season.
After the hoses were installed I reinstalled the battery shelves and boxes, all that remains with the electrical system upgrade is to install the new batteries. They are in, just waiting to be picked up from Sun Harbor.
On the shakedown run she ran a little hot. After inspection there was a ton of grass in the heat exchanger and hoses from last season. Now with the sea strainer in place that will all be eliminated. After cleaning the leftovers out she ran great, only getting up to about 165 degrees and the risers ran at a cool 75!
Can't wait to get back on the water on a regular basis and start catching again. I was so elated with being back in the water that I forgot to take pictures of the completed system, I will take some next week and post them with hopefully pics from my first striper of the season.